top of page

Let's Prepare to Fly!

Sep 18, 2024

1 min read

0

1

0




Today was the first meeting where all members of the team collaboratively worked hands-on with the UAS. The main goal of the meeting was to get familiar with the hardware and electrical components involved in this system. This current design has been passed on from the previous 2024 TCNJ UAS team, and our overall task is to innovate the current design of the frame to fly. The team aims to rearrange the placement of compartments and fitments, substitute for lighter and more aerodynamic materials, hide loose electrical wiring, and produce rigorous types of testing to ensure safe flight every time the UAS is operating.

Sep 18, 2024

1 min read

0

1

0

Comments

Share Your ThoughtsBe the first to write a comment.

© 2035 by Marketing Inc. Powered and secured by Wix

bottom of page